Date Listed:
Aug 5, 2023
Last Updated:
Mar 24, 2025
For Lease
New Electrical 3-Phase 800 Amp Service.
New Trane High Efficiency Roof Top Units.
3,000 SF of 8” Thickened Slab for Brewery or Distillery Setup with Sloped Floor to Trench Drains. Trench Drains Installed with New Cast Iron Pipe to Handle High Temperatures.
Truck Docks with One Expanded Height Door.
Underground Rough Plumbing Installed for Oversized Bar Area (640 SF) with (160 SF Cooler Area).
Underground Rough Plumbing Installed for Large Women’s Restrooms (220 SF), Large Men’s Restrooms (220 SF), Family Restrooms & 2 Employee Restrooms.
Underground Rough Plumbing Installed for 800 SF Kitchen Including Grease Trap.
Designed to Accommodate (800 SF Cooler Area) in Back of House.
2,500 SF Outdoor Patio Area with 12’ High Retaining Wall.