Located in Fairgrove Business Park just off Hwy 70, this new construction
Industrial facility built with concrete pre-cast panel walls is ideal for light
manufacturing, packaging, or distribution. Roof is a mechanically attached TPO
Roof with R-15 Insulation. Floor is 6” steel-reinforced slab with 35 pounds per
cubic yard of 4D 65/60BG steel fibers. 1 hour to Charlotte Douglas International
Airport.