Andover Plaza
Spaces
Retail | 2 spaces available | 3,486 SqFt - 3,555 SqFt
Building description
Prior cancer care center with secure vault for radiology and similar uses - more information to follow
Building highlights
• Easy Access to I-5 / 405 & SR-67
• End-Cap Suite #100 - Exterior Signage
• Abundant / Free Parking
• Abundant Shopping, Walking Trails / Dine –in-Take-out.
• PARK TENANTS : WA State DMV, Concentra Medical, Sound Credit Union, US Health Works, VI, Resorts, Benca Dentistry
ABOUT THE SPACE/SUITE
Prior tenant: Rainier Cancer Center in Tukwila specializes in radiation oncology, providing state-of-the-art treatments for cancers including prostate, breast, head/neck, colorectal, brain/CNS, bone, skin, lung, gynecologic, and metastatic disease.
Vault equipment: The vault housed a 2011 Varian Clinic 21iX-series linear accelerator (LINAC), with associated CT simulator gantry (likely GE Optima CT580), bariatric treatment table, and Dorado laser system.
Vault type: Weller Construction built a high-density concrete shielding vault optimized for radiation oncology LINAC (high-energy beam shielding) / for Varian Clinac 21iX-series LINAC (high-energy X-ray beams, 6-25 MV).
Dimensions:
Walls: 8 ft thick (all sides)
Roof slab: 13 ft thick (above 10 ft ceiling)
Floor slab: 3 ft thick (sits on -3 ft elevation)
Pit: 13 ft 9 in deep x 5 ft 6 in wide (under gantry)
Footprint: 36 ft x 32 ft overall (22’x13’x10’ height interior)
Concrete Reinforcement (Rebar Schedule)
Walls: #8 bars @ 12” o.c. both ways, both faces (4 curtains noted)
Roof: #6 bars @ 12” o.c.
Floor: #7 bars @ 12” o.c. both ways
Dowels/Laps: #6 @ 12” o.c., 3 ft min lap, 3” cover
Build Sequence Highlights
Excavate: To -4 ft, add crushed rock base (soils report required)
Pour Floor/Pit: 3 ft slab, align with existing floor (±1/4” lip)
Walls & Roof: Form/pour 8 ft/13 ft thick, tie to building trusses (8 ft spacing)
Supports: 4x4 steel tubes (HSS) w/ 5/8” epoxy anchors; 2.5 ft deep concrete saddles
Shielding Add-Ons: Steel plates in walls/roof; foam gaps; door recess (S4.1)
Finish: Grout pit base (147 lb/ft³, 2000 psi, 7-day cure pre-equipment)
Listing Contacts
Property History
Similar Properties
Is there information that looks off?
