Sky Vista @ 126th
Spaces
Industrial | 4 spaces available | 11,499 SqFt - 76,635 SqFt
Building description
For Lease
Building highlights
- Located at the Nexus of Bangerter Highway and 12600 South
- Bangerter Highway Frontage
- Close Proximity to Workforce
- Easy Access to Mountain View Corridor, Bangerter Highway and I-15
- Ideal Location Between Bangerter Highway and Mountain View Corridor
- Mountain View Corridor Under Construction to Connect Directly to California Avenue in Salt Lake’s Northwest Quadrant
- Zoning: Pcc – Planned Commercial
Building 1:
– 2,200 Amps / 480 / 277 Volt Available
SUITE 300-400
– 22,998 Total SF
– Estimated Ready for Occupancy 5/1/2026
– Four (4) 9’ x 10’ Dock High Doors with bumpers
- Two (2) Dock High doors equipped with bumpers, hydraulic levelers, and seals
– Two (2) 14’ x 16’ Ground Level Door
– 28’ Clear Height
– 56’ x 48’ Column Spacing
– 59’4” Staging Area Column Spacing
– ESFR Fire Suppression System
– 6” concrete floor slab 3,500 PSI
– Immediate Bangerter Highway Access
– High-profile South Valley Industrial Park
– Many surrounding amenities
SUITE 600
– 11,499 Total SF
– Two (2) 9’x10’ Dock High Doors with bumpers
- One (1) Dock High Door equipped with bumpers, hydraulic levelers, and seals
– 28’ Clear Height
– 56’ x 48’ Column Spacing
– 59’4” Staging Area Column Spacing
– ESFR Fire Suppression System
– 6” concrete floor slab 3,500 PSI
– Immediate Bangerter Highway Access
– High-profile South Valley Industrial Park
– Many surrounding amenities
Building 2:
– 76,635 SF available
- 4,231 SF office
- 473 SF shipping office
– Divisible to 10,862 SF
– Estimated Ready for Occupancy 8/15/2026
– 800 Amps / 480 / 277 Volt Available
– Clear height: 32’
– NFPA-13 ESFR sprinklered
– Sixteen (16) dock high doors with bumpers (9’x10’)
- Five (5) fully equipped with bumpers, seals, and levelers
- Six (6) equipped with bumpers and seals
– Three (3) ground level doors (14’ x 16’)
– LED lighting large glass front entryways
– 6” concrete floor slab – 3500 PSI
– Clerestory windows throughout
– Concrete tilt up
– Rear load configuration
Building 3:
Shell to be delivered June 2026
– 58,302 SF available
- 3,000 SF office
- Divisible to 11,328 SF
– 32’ clear height
– 200’ – 260’ building depth
– 125’ – 127’ truck court depth
– 4,000 Amps / 480 / 277 Volt available
– Nine (9) dock high doors (9’x10’)
– Four (4) ground level doors (14’x16’)
– Column spacing: 56’x60’
– 6” concrete floor slab – 3,500 PSI
– LED lighting
– 211 auto parking stalls
– Large glass front entryways
– Clerestory windows throughout
– Concrete tilt up
– Rear load configuration
Building 4:
Shell to be delivered June 2026
– 34,994 SF available
- Divisible to 7,032 SF
– 24’ clear height
– 140’ building depth
– 2,000 Amps / 480 / 277 Volt Available
– Five (5) ground level doors (14’x16’)
– Column spacing: 46.6’x50’
– 6” concrete floor slab – 3,500 PSI
– LED lighting
– 72 auto parking stalls
– Large glass front entryways
– Clerestory windows throughout
– Concrete tilt up
– Rear load configuration
Listing Contacts
Map
Property History
Similar Properties
Additional Information
Is there information that looks off?






























