

PWR-GEN 345-KV-2500'>SITE,COLO/HYPER/NAT.G-1600'>SITE,*JEDD*
Hyper/Colo./345kv 2500'>SITE, 1350'-65,000+AVPD, NAT. GAS 1600' >SITE,INDUS.,DATA C.,POWER GEN. LAND
Marketing description
*** PRICE $28,000,000 / $383,561 ACRE ***
*Price Increase 9/1/26*
(BEHIND-THE-METER)
Behind-the-meter (BTM) power generation refers to energy systems located on a customer's premises—behind the utility meter—that generate electricity for on-site consumption. Excess energy can often be exported to the grid, while some systems, like data centers, use BTM for high-density, reliable power.
Greater Columbus Development Opportunity With Immediate Access to Heavily Trafficked Interstate I-70 With Over 65,000 + Avpd Along Site Frontage. 8,000+ Avpd Traffic Count on Sr-158. 3rd Lane on I-70 East/west Planned in Next 2-3 Years. *directly South of Industrial Park. (Two 500k Sqft Warehouses + Mixed Use Sites) Planed for Q3 2026. *14 Miles South of New Intel Site ****last Exit East on I-70 That is Not in Floodway With Strong Labor/infrastructure Until Zanesville Exit.**** Property is Located Off of the First Exit East of the Etna Sr 310 Interchange Where Amazon and Kohl's Distribution Centers Are Located. The Property is 1/2 Mile to Sr-158/I-70 Interchange, 15 Miles East of I-70/i-270 Interchange, 15 Miles to Newark, 3 Miles to Etna, Buckeye Lake, Hebron, 21 Miles to Downtown Columbus. ****Site is within 2500 ft North of 345-KV & 1 Mile West of 138-KV power lines for possible future Data Centers/Power Generation. Site Will Allow Approximately 1m Sq Ft Building With 40' Clear Height With Rerouting of the Creek. (Jurisdictional Water Way) 1350' of Frontage on I-70, 800' Frontage on Palmer Rd. The Property is Currently Zoned Agricultural, With the Ability to Be Re-zoned. *No Wetlands on Site. Sewer & Water Near Site. (1500-2000 Ft.Depending on connection point). Sewer access will be approximately close to subject property site by Q1 2027 (estimated).
(2.5 MI. from SITE)
Fairfield Energy Center will generate approximately 1,300 megawatts (MW) of electricity using a mix of modern gas turbines and energy storage systems. These technologies are highly efficient, producing more energy with less fuel while providing reliable power generation.
*Data center expansion has recently surged across AEP Ohio's service area, particularly in Central Ohio. The growing presence of these facilities is a critical factor behind the region's soaring electricity demand, which is now projected to more than double by 2030. *Agent (David Coe) is Principal in This Property.
Investment highlights
- I-70/SR-158 Industrial/Data Park-Freeway Frontage
- * DATA/COLO./HYPERSCALE/POWER GENERATION Center Location******
- * CenturyLink Commercial Dark Fiber (CDF) with High speed along the site.
- * 1350 Ft. Freeway frontage (65,000 Dailey Traffic Counts)
- * JEDD/CRA (JEDD - Kirkersville/HEBRON/Union TWP.)
- ****** 2500ft North of 345 Kv Transmission Line ******
- ****** 1 mile west of 138Kv Transmission Line ******
- ****** 1600 Ft .+/- > NAT. Gas Transmission Line ******
- 3/4 mile to I-70 on ramp
- 14 mi. from INTEL.
- *1 Mile North of 26” Natural Gas Transmission Line (TL-400)
- 20 min drive time to John Glenn International Airport (CMH)
- Power Company (South Central Power-Co-op (AEP)(PJM)
- Sewer/Water (Licking Regional Water District)
- Dark Fiber (Century Link/LUMEN)
- Municipality (Village of Kirkersville)
- Army Corp District (Huntington)
Listing Contacts


Valuation Calculator
Valuation Metrics
Map
Broker Selected Comps View More Comps
Property History
Similar Properties
Additional Information
Is there information that looks off?












