Listed by JLL - Columbus | Front Street, Ohio, JLL - Indianapolis, Indiana, JLL - Pittsburgh, Pennsylvania
Unpriced
Data Center Opportunity
Details
Property Type Land
Sub Type Commercial
Acreage 20 - 110
Land
Marketing description
For Sale
Investment highlights
- Fully entitled data center site with minimal development risk and speed to market opportunity.
- Two FirstEnergy substations (138kV) adjacent to the site.
- Arrangements for “behind the meter” natural gas power in place through Bedford Management Partners (24 months to first power).
- +300 acre site that can be graded with on-site construction equipment and aggregate from an operating quarry. ±350 acres of expansion land available. Quarry will be decommissioned upon sale.
- On-site natural gas line can support 80-100MW with 6-mile pipeline expansion option to support 1GW.
- 138kV and 500kV power lines and three substations within 6 miles of the site
- 100 MW of "behind the meter" power expected within 24 months.
- PHASE 1:
- 100MW of "behind the meter" power with N + 1 redundancy to be online within 24 months of start, with grid competitive pricing.
- BMP to finance, construct, and operate "behind the meter power assets
- Jenbacher 624 reciprocating engines (JMS 6245) installed to provide N + 1 99.99% redundancy for 100MW
- The units can be brought on-line within 24 months from project approval, providing significant schedule benefits vs. the time required for combined cycle or new grid interconnect
- Each JMS 624 generates 4.4 MW at 46.5% electrical efficiency at full load and can be operated as part of a combined cooling heat and power system ("CCHP")
- Units can operate on a blend hydrogen and natural gas (up to 100% H2) to produce lower air emissions than grid supplied power
- PHASE II:
- 300MW of additional behind the meter power using combined cycle gas turbines (CCGT) online within 36-42 months of start, with grid competitive pricing.
- Natural gas turbines operating in combined cycle with battery energy storage systems
- Redundancy through N+1 configuration with 99.99% reliability
- Potential to use gas turbine waste heat for cooling
- Units can be brought online within 36-42 months of project approval)
- Hydrogen & natural gas blending also available for reduced carbon emissions
- PHASE III:
- 1GW via connections to a 138kV substation (1.5 mile from the site) and/or two 500 kV substations (within 6 miles of the site) expected interconnection after 48 months.
Listing Contacts
Listed by JLL - Columbus | Front Street, Ohio, JLL - Indianapolis, Indiana, JLL - Pittsburgh, Pennsylvania
Valuation Calculator
Login or Sign up to see Valuation Metrics
Sign up for Crexi to see valuation metrics for this property
Loan Amount
$--
Annual Debt Service
$--
$--
Annual Cash Flow
$--
$--
Valuation Metrics
0
DSCR
--
Cap Rate
--
ROI
Map
Broker Selected Comps View More Comps
Property History
Similar Properties
Is there information that looks off?














