Nepperhan Avenue C & D
Prime C & D Site Potential - NYS Permit Process Has Already Begun
Marketing description
Ideal C&D Waste Facility (Near Permit Approval) – Summary Description
This proposed Construction & Demolition (C&D) waste processing facility represents a modern, efficient, and environmentally responsible operation that is currently in the final stages of permitting. Designed to exceed regulatory standards and industry best practices, the facility will provide reliable regional capacity for diversion, recycling, and responsible disposal of construction-related debris.
Key Features:
- High Diversion Rates: Engineered to achieve 70–90% recovery of recyclable materials—including wood, metals, aggregates, cardboard, drywall, and plastics—through a combination of mechanical sorting, manual QC lines, and advanced screening systems.
- State-of-the-Art Processing Line: Incorporates scalping screens, magnets, air separation, optical sorters (if applicable), and density separators to maximize material recovery and minimize landfill disposal.
- Optimized Site Layout: Includes dedicated in-bound and out-bound traffic flows, covered tipping areas, stormwater-controlled processing pads, and ample buffer zones to meet environmental and community standards.
- Environmental Protections: Stormwater retention, dust suppression systems, noise mitigation, and best-practice erosion controls ensure the facility meets or exceeds environmental permitting requirements.
- Flexible Throughput Capacity: Designed to process X tons per day (you can specify) with scalable equipment and modular expansion potential.
- Market-Ready Recycled Products: Produces clean aggregate, mulch-grade wood, scrap metal, and other recyclable commodities for regional resale markets.
- Community & Regulatory Alignment: Incorporates sustainability elements—recycling goals, reduced landfill dependence, circular-economy outcomes—aligned with state and municipal waste management plans.
Permitting Status:
The facility has completed key environmental, zoning, and operations reviews and is currently in the final approval phase. All technical documents—including the Operations Plan, Environmental Management Plan, Stormwater Pollution Prevention Plan (SWPPP), and Traffic Impact Assessment—have been submitted to regulatory authorities. Only minor conditions and administrative steps remain before full operational authorization.
Office Building: 2,450 ft available for lease at $6,500 per month
Investment highlights
C&D Waste Processing Facility | Near Permit Approval
Shovel-Ready Infrastructure Opportunity | High-Efficiency, Sustainable Design
A rare opportunity to acquire a near fully approved Construction & Demolition (C&D) waste processing facility, purpose-built for high diversion rates, operational efficiency, and strict environmental compliance.
With permitting in its final phase, this project offers a de-risked, shovel-ready entry into a high-demand, infrastructure-backed sector with strong long-term fundamentals.
FACILITY OVERVIEW
This next-generation facility has been engineered to exceed modern regulatory standards while maximizing throughput, recovery rates, and revenue generation.
KEY FEATURES
♻️ High Diversion & Recovery Performance
- Designed to achieve 70–90% material recovery rates
- Processes: wood, metals, aggregates, drywall, cardboard, plastics
- Minimizes landfill reliance while maximizing resale value of recovered materials
⚙️ Advanced Processing Systems
- Fully integrated, high-efficiency sorting line including:
- Scalping screens
- Magnetic separation
- Air & density separation
- Optional optical sorting technology
- Engineered for maximum throughput and minimal residual waste
🚛 Optimized Site Design
- Dedicated inbound / outbound truck circulation
- Covered tipping areas for all-weather operations
- Stormwater-controlled processing surfaces
- Integrated buffer zones for compliance and community compatibility
ENVIRONMENTAL & REGULATORY DESIGN
- Comprehensive stormwater management system
- Dust suppression and noise mitigation infrastructure
- Erosion control and environmental safeguards
- Designed to meet or exceed all state and local regulatory requirements
REVENUE & OPERATIONS
📈 Multiple Revenue Streams
- Tipping fees (primary revenue driver)
- Recycled material sales:
- Aggregates
- Metals
- Wood products
🔄 Operational Flexibility
- Scalable throughput capacity (high daily tonnage design)
- Modular expansion capability
- Adaptable to evolving waste streams and regulatory changes
PERMITTING STATUS
Final Approval Phase – Significantly De-Risked
All major submissions completed, including:
- Operations Plan
- Environmental Management Plan
- Stormwater Pollution Prevention Plan (SWPPP)
- Traffic Impact Study
Only minor administrative steps remain prior to full authorization.
STRATEGIC ADVANTAGES
- Positioned within a supply-constrained, high-demand market
- Aligns with state and regional sustainability & diversion mandates
- Supports circular economy initiatives
- Critical infrastructure asset with long-term relevance
INVESTMENT HIGHLIGHTS
- Near shovel-ready development
- Strong barriers to entry (permitting + regulatory)
- High-demand sector with durable cash flow potential
- Environmentally aligned, future-proof design
- Opportunity for rapid operational launch post-approval
SUMMARY
An institutional-quality opportunity to acquire a fully engineered, near-approved C&D processing facility with significant upside, strong environmental alignment, and immediate path to operation.
📞 Contact for plans, permitting documentation, and financial projections.
If you want, I can push this further into:
- A private equity / infrastructure fund pitch version
- A one-page OM (offering memorandum)
- Or a hard-selling broker version with urgency and pricing hooks (very different tone)
Listing Contacts
Valuation Calculator
Valuation Metrics
Broker Selected Comps View More Comps
Property History
Tax History
Similar Properties
Additional Information
Is there information that looks off?
