10093 N 300 W | Potential Data Center Site | I1 Zoning
Details
Property Type Land
Sub Type Industrial
Pads 3
Acreage 33.000
Zoning I-1
Immediate 20MW Capacity | Customer Substation Required | Scalable Site | NIPSCO 69kV Service
Marketing description
This is:
- Phaseable power site
- Edge / modular deployment ready
- First 20MW = immediate execution
- Scale = user-driven infrastructure build
SITE OVERVIEW
Location
- 10093 N 300 W, Lake Village, IN
- Newton County (unincorporated)
Access
- Regional connectivity via:
- US 41
- I-65 corridor (proximity play)
- Truck + equipment accessible
Land Characteristics
- Flat, developable land
- Scalable footprint for:
- Multi-phase deployment
- Substation + infrastructure build
Investment highlights
1) PROPERTY HIGHLIGHTS
- 33± Acre Site – Newton County, IN (Unincorporated)
- Immediate feasibility: ~20MW power
- Expandable to large-load (20MW+) via NIPSCO process
- Located within NIPSCO electric service territory
- 69kV transmission-supported area
- Customer-owned substation required on-site
- Ideal for:
- Edge data center
- Phased hyperscale entry
- AI / compute pods (incremental deployment)
- No municipal overlay constraints (unincorporated = faster path)
- Positioned for economic development-driven incentives packaging
2) POWER OVERVIEW (CORE SELL)
Current Power Feasibility
NIPSCO (power provider) engineers completed a high‑level desktop review of serving a 20 MW load at the site.
At a high level, NIPSCO circuit 6935, sourced from Thayer Substation (Parish Ave & 241 Ave), could be tapped and extended approximately 2.5 miles to the site.
- ~20MW capacity achievable under current conditions
- NIPSCO confirmed:
- 69kV system can support load
- No thermal overload under normal + contingency conditions
Infrastructure Requirement
- Customer must construct on-site substation
- Interconnection via NIPSCO 69kV system (approximately 2.65 miles of upgrades needed)
Critical Constraint
- 20MW is the thresholdAbove this → triggers NIPSCO Large Load Process
Large Load Expansion Path (20MW+)
If scaled beyond 20MW:
- Requires:
- Large Load Intake Application
- Credit review
- Letter of community support
- Process includes:
- Paid engineering studies
- Infrastructure modeling
- Timeline + cost determination
- Timeline:~30 days for initial high-level response (post submission)
- Important:
- Final power delivery timelines and costs are:
- Site-specific
- User-driven
- Dependent on study outcomes
- Final power delivery timelines and costs are:
REGULATORY + ENTITLEMENT POSITION
Jurisdiction
- Unincorporated Newton County
Zoning
- I-1 (Light Industrial)
Listing Contacts


Listed by SKYRISECRE
Valuation Calculator
Login or Sign up to see Valuation Metrics
Sign up for Crexi to see valuation metrics for this property
Loan Amount
$0.00
Annual Debt Service
$--
$--
Annual Cash Flow
$--
$--
Valuation Metrics
0
DSCR
--
Cap Rate
--
ROI
Map
Broker Selected Comps View More Comps
Property History
Tax History
Similar Properties
Additional Information
Name
License
Brokerage Phone
Is there information that looks off?