Knoxville Data Center 2575 Willow Point Way Ste 103
Special Purpose | 1,209 SqFt
Marketing description
Updated information from the seller: https://forsale.knoxvilledatacenter.com/
Discover an exceptional opportunity to acquire a fully operational data center located at 2575 Willow Point Way, Suite 103, Knoxville, TN. This 1,209 sq. ft. commercial office condo unit, built in 2007, is designed for efficiency and security, making it ideal for businesses seeking a reliable data management solution.
This Tier 2 data center features a fully functional data center, two office spaces, and a bathroom. To ensure uninterrupted service, the facility is equipped with a dedicated 800 AMP power supply directly from the transformer, complemented by a 250 kW Caterpillar diesel generator for seamless backup power.
Advanced cooling is provided by Mitsubishi split units, delivering a total cooling capacity of 27 tons. The property also includes a FIKE Clean Agent Fire Suppression System.
Security is paramount, featuring a Kantech access control system, secure key fob entry, and comprehensive video surveillance. The data center is divided into three secure, caged areas for restricted access, equipped with a complete AC Symmetra rack system, facility-wide 10GbE cabling, and anti-static flooring.
Enterprise-grade Cisco routing and switching with dual fiber circuits (WOW and Comcast) for high-speed access, along with expansion options for additional bandwidth. Additionally, there is roof space available for further infrastructure development.
Fantastic location between Knoxville and Oak Ridge. A location situated in a region with four mild seasons making it an ideal investment for tech companies, cloud service providers, or any business requiring secure and efficient data management solutions. With its strategic location and comprehensive features, this data center is poised to meet the demands of modern enterprises. Call for more details.
Investment highlights
This fully functional, turnkey data center for sale in Knoxville, Tennessee offers 1,209 square feet of enterprise-grade infrastructure in the Southeast US. Located in the growing West Knoxville / Hardin Valley area, this commercial data center property provides turn-key colocation capabilities with 800 AMPs power, BGP routing, N+1 redundant cooling, and carrier-neutral fiber connectivity. Eliminate $300K-$500K in data center construction costs and 18-month construction delays.
Listing Contacts
Valuation Calculator
Valuation Metrics
Map
Zoning
Broker Selected Comps View More Comps
Property History
Similar Properties
Additional Information
Is there information that looks off?



























